AFTERMARKET.SUPPLY
New Holland CNH D350 SEGMENT GROUP

FIAT KOBELCO CASE New Holland CNH D350 segment group Berco FT4529 87679474 76069092 76066464

Crawler Dozer New Holland D350 Carrier rollers 76066464

Just as sprockets, segments also consist of a metal inner ring with bolt holes and a gear ring. However, it is different from sprockets, segment groups exist from individual segments which make up the sprocket for the undercarriage of bulldozers. This means that the segments can be exchanged without dismantling the track link, easier maintainence work for segment group than sprocket.


Description


China TAC consrtuction machinery also manufacturer replacement New Holland D350 Crawler Tractor undercarriage parts D350 undercarriage repair list below:

New Holland D350 TRACK ROLLERS SF 76093446 New Holland D350 Bottom rollers single flange D350 lower rollers SF

New Holland D350 TRACK ROLLERS DF 76093445 New Holland D350 bottom rollers double flange D350 lower rollers DF

New Holland D350 IDLER WHEEL  76093404

New Holland D350 Chain 44L wihout shoes 76074637  

D350 track links assy  D350 track chains lubricated 44Links

New Holland D350 SEGMENT 87679474 

New Holland D350 TEETH 

This D350 sprocket have 9holes 9teeth segment group ; 4holes 5teeth segment and 3Holes 3Teeth to be one circle sprocket.

China TAC consrtuction machinery also produce Crawler Dozer D150 undercarriage parts, and Crawler Dozer D180 undercarriage parts, Pls feel free contact us. We can OEM every dozer and excavator undercarriage for you, according your drawing and requirements.


#Каток поддерживающий 76066464 New Holland D350


#Группа сегментов 76069092 New Holland D350


#Каток опорный двубортный 76093445 New Holland D350


#Каток опорный однобортный 76093446 New Holland D350


FUNCTIONS New Holland D350 undercarriage parts made in china

Material 35MnB or 40MnB.

Colors Black or Yellow

Processing Forging, Casting, Machining, Heat treatment

Certification ISO9001:2008  SGS

MOQ 1 set

Delivery Time Within 5days after payments.

Warranty One Year

Payment Western Union  T/T(T/T 30% deposit in advance, the balance 7 days before the shipment.)

Shipping Port XIAMEN

OEM/ODM Service Available


send inquiry to us

Related Product

Chat with us